Residential Home Builder | RMN Construction Chatham Day School

Construction of new addition to existing school. This project consisted of joining an existing building with a new building while the school was still functioning and in session. RMN completed the carpentry trades and other various trades on time and within budget. These trades comprised of: Framing of both metal walls and wood trusses, construction of partition walls, floor systems, structural walls, and installation of cedar roofing and metal coping for a parapet wall. In addition, RMN installed all insulation and draft stopping, sheetrock to a paint ready finish and allacoustical ceilings and soffits. RMN also installed all interior doors and hardware.

  • © 2017. RMN Construction - All Rights Reserved.

    Site by S-FX.com